Production cycle: 40±5pcs/min
Machine power: maximum power 20KW
(Ultrasonic 2.6KW*2 + 2KW*2 + other equipment 10.8KW)
Air source: compressed air should be stabilized above 0.5Mpa
Trachea with a diameter of 12: connect to the triple piece, and reserve 2 ports
Power supply: 220V 16A
Dimensions mm: 9800(L)*1400(W)*2000(H)
Equipment action process: 1. Raw material loading (place four or five layers of fabric according to product requirements) → push nose bridge → body knurling → left ear band welding → right ear band welding → coding (optional coding according to requirements Or laser marking) → folding → edge banding → cost cutting → finished product discharge
Installation requirements
1. Check the bearing capacity and flatness of the ground, comprehensively consider the total weight of the machine and the vibration caused by the machine during operation.
2. Place the machine horizontally and adjust the feet of each machine to make it level.
3. Before turning on the power, carefully check whether the connections are loose.
4. Connect the power supply correctly.
5. The required power supply is AC 220V/50Hz.
Equipment maintenance
The daily maintenance of the equipment is to ensure that the equipment is running well, reduce the failure rate and improve the equipment.
Effective means to prepare the service life. Customers should pay special attention when using equipment for production activities.
1. In the process of operating the equipment, the operator should pay close attention to the operation of the equipment, make a record of the equipment operation, and record the operation of the equipment in the class in detail for the equipment maintenance personnel to refer to when inspecting and maintaining the equipment.
2. If an abnormality is found, the machine must be shut down immediately, and the maintenance personnel must be notified to deal with it, and the machine can be restarted after the fault is eliminated.
3. The equipment maintenance personnel shall conduct regular inspection, maintenance and maintenance of the equipment.
4. Before servicing the equipment, you must disconnect the power supply and follow the relevant safety regulations.
5. Any fixed protection device needs to be opened or removed due to maintenance. After maintenance, it must be restored to its original position intact.


主站蜘蛛池模板: 亚洲色图第一区 | 久热精品在线观看 | 在线日韩一区 | 一区二区国产视频 | 麻豆社| 亚洲精品乱码久久久久久蜜桃91 | 毛片视频网站在线观看 | 国产成人啪免费观看软件 | 特级aaaaaaaaa毛片免费视频 | 美女扒开腿让男生捅 | 日韩欧美中文一区 | 伊人偷拍视频 | 亚洲一区二区视频在线观看 | 国产精品1000部啪视频 | 免费特级黄毛片 | 色哥网 | 在线观看欧美一区二区 | 欧美日韩在线视频观看 | 午夜精品久久久久久毛片 | 免费看片黄色 | 国产麻豆午夜三级精品 | 亚洲激情欧美激情 | 久久中文字幕av | 亚洲成人手机在线 | 色老汉av一区二区三区 | julia办公室大战丝袜美女 | 67194无限乱码一二三四 | 成人av番号网 | 草草草在线视频 | 国产精品激情偷乱一区二区∴ | 青春草久久 | 东北女人啪啪ⅹxx对白 | 97对对碰| 这里只有精品6 | 少妇熟女视频一区二区三区 | 午夜99| 天天色综合天天色 | 日韩亚洲精品在线 | 欧美va在线观看 | 在线久热| 麻豆精品在线播放 |